PlesTech Logo  
www.plestech.co.uk  
line decor
  EDT HOME PAGE   ::  
line decor
  Material Regulatory Compliance Module  
   This module is an extremely simple, yet powerful tool, which can carry out many useful tasks. These range from being a valuable source of information on hundreds of materials and substances, along with any legislation restricting there use, to being a powerful tool to satisfy REACH, and easily generate Material Safety Data Sheets. This module also creates the foundation for the rest of the EDT, as it contains much eco-data, including standardised material data for products impacted by the European Energy Using Products Directive (EuP).

New records can be created and existing records edited, so this module can be tailored by users to meet all their needs. In addition to this the tool never gets out of date. New materials, substances and legislation is continually being added into the website, and this data can be easily downloaded and automatically inserted into the the tool's databases.


 
  Supply Chain Management Module  
  Use this module to maximise the eco-performance of your parts and products. With its inbuilt easy to use interface you can use it for many tasks including demonstrating due deligence for the EU RoHS, or for informing the labeling requirements under the Chinese RoHS, or for identifying what parts need to be separated for end-of-life treatment under WEEE or for satisfying the requirements of the EuP directive and driving design improvements.

The module contains the standised data developed by VHK and being used by the preparatory study groups for the EuP directive. Companies can either use this data or there own data to analyse bills of materials and drive environmental product design improvements. The module will never get out-of-date since it is kept updated from the PlesTech website, and scripts inside the module automatically update the records once downloaded.

Table of Module Features
Module Features
A = Material Regulatory Compliance Module
B = Supply Chain Management Module
C = Product Planning Module (2nd qtr. 2007)
D = Concept Design Module (3rd qtr. 2007)
E = Detail Design Module (4th qtr. 2007)
F = Build Scheduling Module (1st qtr. 2008)
G = Management System Module (3rd qtr. 2008)
A
B
C
D
E
F
G
X
 
 
 
 
 
 
X
 
 
 
 
 
 
             
X
 
 
 
 
 
 
X
 
 
 
 
 
 
X
 
 
 
 
 
 
X
 
 
 
 
 
 
X
 
 
 
 
 
 
X
 
 
 
 
 
 
 
X
 

 

   
 
 
X
 
 
   
 
 
X
 
 
   
 
 
X
 
 
 
 
 
 
X
 
 
 
 
 
 
X
 
 
 
 
 
 
X
 
 
 
 
 
 
X
 
 
 
 
 
 
X
 
 
 
 
 
 
X
 
 
 
 
 
 
X
 
 
 
 
 
X
 
 
 
 
 
X
X
 
 
 
 
 
X
X
 
 
 
 
 
X
X
 
 
 
 
 
X
X
 
 
 
 
 
 
 
X
 
 
 
 
 
 
X
 
 
 
 
 
 
X
 
 
 
 
 
 
X
 
 
 
 
 
 
X
 
 
 
 
X
 
X
X
 
 
 
 
 
X
X
 
 
 
 
 
X
X
 
 
 
X
X
X
 
X
 
 
X
X
 
X
 
 
X
X
X
 
X
 
 
 
 
X
X
X
 
 
X
X
X
X
X
 
 
 
X
 
 
 
X
 
 
X
 
 
 
X
 
 
 
 
 
 
 
X
 
X
X
X
X
 
X
 
X
X
X
X
 
X
 
 
  © PlesTech Ltd., 2005 - 2007